Shaybah Fields Expansion . The expansion will provide the Shaybah field with a capacity of 1 million bpd of Arabian Extra Light crude oil, double its initial capacity when it came online in 1. The Shaybah drilling plan encompasses two key strategies to maximize recovery: the first to place wells at deeper locations away from the gas cap to maximize oil recovery; the second to increase the average reservoir contact from 6 to. Second is the construction of a new NGL recovery plant that will be completed by the end of 2.
The project involves the construction of inlet facilities, gas treating units, NGL recovery trains, dehydration, residue gas compression, acid gas compression, NGL storage and shipping, as well as an upgrade of the gas handling capacity for the four existing Shaybah gas- oil separation plants and other associated electrical and nonelectrical utilities. The NGL recovery plant project also includes a major upgrade to increase the power generation capacity to more than 1 gigawatt by installing four cogeneration units, seven single cycle units, a 5. In recognition for its environmental protection efforts, including a planned 6.
Login to access the Oil & Gas Journal Subscriber Premium features. Maan Mohammed Iskander. Based on a presentation to the 2. GPA Europe Annual Conference, Edinburgh, Sept. All the initiatives were thorough..
Maintain oil recovery from Shaybah fields to meet Kingdom’s ethane needs, by increasing the Gas-to-Oil ratio and recovering more NGL (C2+). Saudi Aramco Awards $2.7 Billion in Shaybah NGL Contracts.
Program, Saudi Aramco. The Shaybah NGL Program also includes gas handling facilities to debottleneck. The Shaybah Fields Expansion focuses on two major projects: First is a 250,000 bpd oil production expansion increment, which will be completed by the end of 2015. Shaybah NGL project EPC job awarded to Samsung.